CATT Arnstadt S01 External Works Infrastructure

STRABAG AG Direktion Sachsen/Thüringen - Westthüringen

Sewer & Pipeline ConstructionDevelopmentRoadworksBuilding Supply Engineering

Project Images

Project Description

Commissioned to build the infrastructure around the new battery plant in Arnstadt. • Installing separate drainage pipes for rainwater and wastewater, including connection to the existing sewage network DN 1200 • Ready-to-operate installation of sprinkler, hydrant, and drinking water lines around and between the buildings • Setting up the entire outdoor lighting on the premises • Construction of various prefabricated wastewater pumping structures, including equipment • Construction of the road surface with adjacent paved areas and sidewalks

See original text

About STRABAG AG Direktion Sachsen/Thüringen - Westthüringen

Learn more about the company behind the opportunity
STRABAG AG Direktion Sachsen/Thüringen - Westthüringen
STRABAG AG Direktion Sachsen/Thüringen - Westthüringen

Progress starts with us.

At STRABAG, around 86,000 people at 2,400 locations worldwide are building progress. Uniqueness and individual strengths characterize not only our projects but also each and...

See original text

STRABAG AG Direktion Sachsen/Thüringen - Westthüringen also employs

Construction WorkerConstruction Equipment OperatorPipefitterRoad builderEstimatorConstruction ManagerTraining as a Civil Engineering WorkerTraining to become a construction equipment operator

Key data

207 employees

Employees

42 years

Employee Average Age

1-12 months

Average project time

40 km

Average distance to construction projects in km

15 projects

Active Construction Projects

35,000,000 €

Annual construction volume in €

Civil Engineering

Project Types

Project Details

Project Start31st Mar 2021
Project End1st Sep 2024
Project Duration (Days)1250

Location

Amt Wachsenburg, Germany

Am Ichtershäuser Wege