
Erding Savings Bank
Nutz GmbH
Project Images
Project Description
Project: Complete electrical installation, security technology, network, lightning protection, barrier system, and building automation
Client: Kreis- und Stadtsparkasse Erding Dorfen
Architect: OSA Ochs Schmidhuber Architekten GmbH
Area: 7000m² office space
Besides all the cabling and setting up a complete power supply system, which includes a main and 13 sub-distributions, Nutz GmbH installed a lighting system controlled by presence detectors. Additionally, the Sparkasse building was equipped with comprehensive data technology and floor tanks, as well as lightning protection, SAT, and intercom systems, along with the latest MSR technology.
Security systems for monitoring - alarm and video systems - and access control were also installed, meeting the highest security standards. A fire alarm system was also set up according to the applicable and required standards.
About Nutz GmbH
Since 1978, at Nutz, we know: đŞ We can only achieve top quality and performance for our customers as a strong, well-coordinated team. That's why we create a trusting, family-like work environment for...
Nutz GmbH also employs
Key data
380 employees
Employees
38 years
Employee Average Age
60,000,000 âŹ
Annual construction volume in âŹ
100 projects
Active Construction Projects
1,000 projects
Completed Construction Projects
1-12 months
Average project time
45 km
Average distance to construction projects in km
Engineering Structures
Project Types