Implenia Deutschland

2nd Main Line Munich - VE733 Tunnel East Station

Implenia Deutschland

Infrastructure

Project Images

Project Description

The construction lot VE733 includes the building of two traffic tunnel tubes with cross passages and an exploration and rescue tunnel (ERS) in between, as well as the rescue shafts 7 and 8 (RS7 and RS8) and the underground S-Bahn station Ostbahnhof.

The main tunnels are mostly excavated using tunnel boring machines (TBM) with active face support and segmental lining. Eight cross passages are constructed using the NATM method and protected by ground freezing measures. The deep-level Ostbahnhof and RS7 (both using diaphragm wall construction) and RS8 (bored pile wall) are built using open construction methods. The creation of the junction for the future connection of the southern branch is done by dismantling and widening the TBM tunnel sections in shotcrete construction from RS7 under compressed air.

See original text

About Implenia Deutschland

Learn more about the company behind the opportunity
Implenia Deutschland
Implenia Deutschland

An integrated, multinational leading construction and real estate service provider

As a leading Swiss construction and real estate service provider, Implenia develops, realizes, and manages living sp...

See original text

Implenia Deutschland also employs

Estimator in Technical ControllingRingbauerForemanHead Foreman/WomanAssistantProject EngineerConcrete workerCarpenterMachine Operator/Equipment OperatorTechnicianShow all

Key data

2,300 employees

Employees

Civil Engineering, Building Construction, Engineering Structures

Project Types

Project Details

Project Start31st May 2025
Project End30th Apr 2033
Project Duration (Days)2891

Location

Munich, Germany

Orleansplatz 11