Our HWP Substanzbau Nuremberg has dismantled GSMR radio masts for Deutsche Bahn Netz AG in Neu-Ulm and Beimerstetten. The height of the radio masts was approximately 35 meters each. The dismantling was only possible using a 75-ton heavy-duty crane and special aerial work platforms. Additionally, the radio masts had to be separated into three individual pieces and transported away. The dismantling work could only be carried out at night, so the cutting process looked like a fireworks display at around 23 meters.