Hölscher Wasserbau is in charge of the groundwater management for Lot 2 of the LNG gas pipeline EWA. This lot covers a 30-kilometer stretch between the coastal canal near Oldenburg and Bad Zwischenahn. Hölscher Wasserbau is carrying out around 500 drillings along this route, each with a diameter of 700 mm and up to 12 meters deep. These drillings are being done with a cable excavator. Additionally, the groundwater is being lowered on part of the route using a drainage trencher through horizontal water management. After successfully completing the WAL pipeline in a record construction time of nine months, Hölscher Wasserbau is once again proving its expertise in pipeline construction.

See original text

About Hölscher Wasserbau GmbH

Learn more about the company behind the opportunity
Hölscher Wasserbau GmbH
Hölscher Wasserbau GmbH

Our Goal: Water Neutrality by 2030

Hölscher Wasserbau is a leading company offering connected and comprehensive solutions in the fields of water management, well construction, environmental technolog...

See original text

Hölscher Wasserbau GmbH also employs

Construction HelperConstruction ManagerDrill Rig Operator - Universal Drilling RigDrilling Rig Operator - Rotary Drilling RigDrilling Equipment Operator - Cable ExcavatorConstruction Equipment OperatorWell DrillerElectrician for Construction SitesEstimatorPlant mechanicShow all

Key data

650 employees

Employees

Project Details