Trier Lock - lock structure

HOCHTIEF

InfrastructureWater & Port Engineering

Project Images

Project Description

The 2nd Trier lock was the third of 10 Moselle locks between Koblenz and Trier to be fitted with a second large chamber. Once finished, the new second lock has these dimensions: · Total length: 312 m · Usable chamber length: 210 m · Chamber width: 12.50 m · Lift height: 7.25 m The chamber is filled and emptied through longitudinal culverts. The gates for these culverts are run by electric lifting cylinders. The upper gate is designed as a radial gate and is powered by a hydraulic cylinder. The lower gate is a double-leaf miter gate and is powered by electric lifting cylinders. In November 2021, the lock was officially approved by the WSA and then put into operation.

See original text

About HOCHTIEF

Learn more about the company behind the opportunity
HOCHTIEF
HOCHTIEF

🏗️ HOCHTIEF – We don't just build buildings, we build real milestones. As one of the world's leading construction companies, we put our heart and soul into projects that people will still be marvelli...

See original text

HOCHTIEF also employs

Site Manager (m/f/d) Civil EngineeringEstimator (m/f/d)Scheduler (m/f/d) for Bid Processing in Infrastructure ProjectsWork Planner (m/f/d) for Infrastructure ProjectsSite Manager (m/f/d) Industrial and Civil EngineeringEquipment Operator (m/f/d) Special Civil EngineeringConcrete and reinforced concrete worker (m/f/d)Electronics technician for industrial engineering (m/f/d)Civil engineering worker (m/f/d)

Key data

36,000,000,000 €

Annual construction volume in €

58,705 employees

Employees

Civil Engineering, Building Services, Building Construction, Engineering Structures

Project Types

Project Details

Project Start31st Dec 2013
Project End31st Oct 2021
Project Duration (Days)2861