HOCHTIEF

bridge

HOCHTIEF

Bridge ConstructionTrack WorkMajor Construction SiteInfrastructureCivil Engineering

Project Images

Project Description

As part of the 4-track expansion of the Rhine-Main S-Bahn, the existing 2-track line (line 3900) between Frankfurt (Main) West and Bad Vilbel, which is currently used by both the S-Bahn and other trains, is being expanded to 4 tracks. During this expansion, line 3864 is being moved south of line 3900 and will be used only for S-Bahn service in the future. The whole project involves building new bridges and expanding existing ones. Near the A661 motorway, the current tracks cross over the motorway, which runs through a cutting. For the two new tracks, a two-span in-situ concrete frame structure was built next to the existing bridge using the lowering method.

See original text

About HOCHTIEF

Learn more about the company behind the opportunity
HOCHTIEF
HOCHTIEF

🏗️ HOCHTIEF – We don't just build buildings, we build real milestones. As one of the world's leading construction companies, we put our heart and soul into projects that people will still be marvelli...

See original text

HOCHTIEF also employs

Site Manager (m/f/d) Civil EngineeringEstimator (m/f/d)Scheduler (m/f/d) for Bid Processing in Infrastructure ProjectsWork Planner (m/f/d) for Infrastructure ProjectsSite Manager (m/f/d) Industrial and Civil EngineeringEquipment Operator (m/f/d) Special Civil EngineeringConcrete and reinforced concrete worker (m/f/d)Electronics technician for industrial engineering (m/f/d)Civil engineering worker (m/f/d)

Key data

36,000,000,000 €

Annual construction volume in €

58,705 employees

Employees

Civil Engineering, Building Services, Building Construction, Engineering Structures

Project Types

Project Details

Project Start30th Jun 2021
Project End30th Nov 2023
Project Duration (Days)884

Location

Essen, Germany

Alfredstraße 236