Project Images
Project Description
As part of the 4-track expansion of the Rhine-Main S-Bahn, the existing 2-track line (line 3900) between Frankfurt (Main) West and Bad Vilbel, which is currently used by both the S-Bahn and other trains, is being expanded to 4 tracks. During this expansion, line 3864 is being moved south of line 3900 and will be used only for S-Bahn service in the future. The whole project involves building new bridges and expanding existing ones. Near the A661 motorway, the current tracks cross over the motorway, which runs through a cutting. For the two new tracks, a two-span in-situ concrete frame structure was built next to the existing bridge using the lowering method.
About HOCHTIEF
🏗️ HOCHTIEF – We don't just build buildings, we build real milestones. As one of the world's leading construction companies, we put our heart and soul into projects that people will still be marvelli...
HOCHTIEF also employs
Key data
36,000,000,000 €
Annual construction volume in €
58,705 employees
Employees
Civil Engineering, Building Services, Building Construction, Engineering Structures
Project Types
Project Details
Location
Essen, Germany
Alfredstraße 236