HERING Gruppe

Riedbahn - 3 platform roofs type "Evolution"

HERING Gruppe

Infrastructure

Project Description

The Riedbahn, one of Germany's busiest train lines, was totally modernized as a pilot project for Deutsche Bahn's high-performance network. HERING played its part in improving the infrastructure. For the general overhaul, HERING planned, made, delivered, and set up three system roofs. Three Evolution-type roofs were used at the Walldorf and Dornberg stops. The whole installation was done in just 33 days – while a ton of other work was going on at the tracks and station area. Even with tight deadlines and complex conditions, the job was done precisely, efficiently, and without any delays. With our modular system roofs, we offer custom, sustainable, and cost-effective solutions for modern railway construction. Our station roofs mix functionality with a cool design and are super flexible to adapt.

See original text

About HERING Gruppe

Learn more about the company behind the opportunity
HERING Gruppe
HERING Gruppe

πŸ—οΈ HERING Group – We don't just build infrastructure, we build on you! If you're up for real projects where you can see what you've achieved at the end of the day, then you've come to the right place...

See original text

HERING Gruppe also employs

Railway construction machine operator (m/f/d)Skilled worker (m/f/d) in track constructionSkilled worker (m/f/d) in the precast concrete plantSkilled worker (m/f/d) in civil engineeringRoad-rail excavator operator (m/f/d)Drilling rig operator (m/f/d) in special civil engineeringTrain driver (m/f/d)Work train driver (m/f/d)Crane operator (m/f/d) for railway slewing cranesAgricultural and construction machinery mechanic (m/f/d)Show all

Key data

750 employees

Employees

Civil Engineering, Building Construction, Engineering Structures

Project Types

Project Details

Project Start30th Jun 2024
Project End30th Dec 2024
Project Duration (Days)184