A46 Noise Barrier

HEITKAMP Unternehmensgruppe

Structural engineering - noise barriers

Project Images

Project Description

The A46 is being expanded to six lanes to close the gap in the existing Westring structure between the Sonnboner Kreuz and the AS Haan-Ost (operating kilometer 96+014). In anticipation of this measure and to protect residents from noise as early as possible, a new noise barrier was built in the direction of Wuppertal following the bridge structure. The existing noise barrier was dismantled and replaced with the new one, which stands 7.50 meters above the gradient.

See original text

About HEITKAMP Unternehmensgruppe

Learn more about the company behind the opportunity
HEITKAMP Unternehmensgruppe
HEITKAMP Unternehmensgruppe

Our World. Our Construction Site.

For over 133 years, HEITKAMP has been bringing challenging construction projects to life in infrastructure, earthworks, and environmental protection. With around 700...

See original text

HEITKAMP Unternehmensgruppe also employs

Civil Engineer (m/f/d) / Work Preparer (m/f/d) Focus on ConstructionSite Manager (m/f/d) Demolition/DeconstructionConstruction Manager (m/f/d)Construction Manager (m/f/d) Bridge ConstructionSite Manager (m/f/d) Hazardous Material RemediationConstruction Manager (m/f/d) Earth/Deep ConstructionSenior Site Manager (m/f/d) Earth/Deep ConstructionSurveying Engineer (m/f/d)Asphalt Builder (m/f/d) / Machine Operator (m/f/d) ScreedCalculator (m/f/d)Show all

Key data

700 employees

Employees

1-2 years

Average project time

41 years

Employee Average Age

200,000,000 €

Annual construction volume in €

40 km

Average distance to construction projects in km

40 projects

Active Construction Projects

Civil Engineering

Project Types

Project Details