A535 Bridge at Putschenholz
HEITKAMP Unternehmensgruppe
Project Images
Project Description
Renewal of the highway bridge along the BAB A535 as a new 3-span prestressed concrete bridge with a total length of about 70 meters and two independent substructures. As part of this, the road structure of the highway was renewed over approximately 180 meters, including the frost protection layer.