Bridges L518 Werne
HEITKAMP Unternehmensgruppe
Project Images
Project Description
Replacement of two bridges over the L518, including the demolition of the old structures. The two new bridges were built as a pilot project using a new prefabricated construction method for the superstructure and substructures, including the adjacent retaining walls. This is intended to significantly shorten the construction time.