Pressure line and pumping station for the Burger Str. clinic, including a shotcrete excavation pit
Gustav & Otto Müller GmbH & Co. KG
Project Images
Project Description
A sewage pumping station with a collection shaft was built on the grounds of the Sana Clinic, from which the wastewater from the catchment area is fed through a PE-HD pressure pipe into a transfer structure on Burger Straße. A second and third pressure pipe serve as backups.
The special thing about this project was the elliptical reinforced concrete excavation pit, the large precast concrete parts, the tight space in the connection area of Burger Straße for the transfer structure, and the HDD horizontal directional drilling.
About Gustav & Otto Müller GmbH & Co. KG
We are Gustav & Otto Müller GmbH & Co. KG and we're looking for new people to join our team. If you're up for real construction projects and a company that mixes tradition with a chill work vibe, then...
Gustav & Otto Müller GmbH & Co. KG also employs
Key data
30 km
Average distance to construction projects in km
10 projects
Active Construction Projects
40 employees
Employees
1-12 months
Average project time
15,000,000 €
Annual construction volume in €
Civil Engineering, Service Work, Engineering Structures, Rolled/cast asphalt
Project Types