Expansion of the Winterhagen stormwater retention basin
Gustav & Otto Müller GmbH & Co. KG
Project Images
Project Description
For the expansion of the rainwater retention basin, a new dam body was built, including a throttle structure and an overflow sill. To do this, the course of the Winterhagener Bach stream was rerouted. The old dam body and the existing throttle system with its monk structure were dismantled.