Project Description

The interchange structure at the Bonn-Endenich junction on the A 565 / B 56 is colloquially known as the "Endenich Egg" due to its egg-shaped design.

The superstructure is divided, similar to the existing structure, into two partial superstructures (one for each direction of travel) as follows:

· Northwest Superstructure

· Southeast Superstructure

The superstructure is to be constructed in an elevated position on a support and protection scaffold with lowering devices while traffic continues to flow on the A 565, and then lowered during a full closure once the concrete has hardened.

The replacement structure is to be built in such a way that the new bridge can be converted into a tunnel at a later date. The replacement structure would then serve as the tunnel portal.

Once the construction is completed, the traffic system will continue to be routed in an arch shape over the bridge, similar to the existing setup. During the execution, as many lanes as possible must be kept open.

See original text

About Fritz Meyer GmbH Bauunternehmung (Meyer Bau)

Learn more about the company behind the opportunity
Fritz Meyer GmbH Bauunternehmung (Meyer Bau)
Fritz Meyer GmbH Bauunternehmung (Meyer Bau)

As a company with a long-standing tradition and over 75 years of success in the market, we have decades of experience in the construction industry, as well as in our daily interactions with people. Su...

See original text

Fritz Meyer GmbH Bauunternehmung (Meyer Bau) also employs

Estimator (m/f/d)Construction Manager for Building Construction (m/f/d)Foreman for Building Construction (m/f/d)Project Manager for Building Construction (m/f/d)Project Manager for Civil EngineeringEstimator (m/f/d)Construction Manager for Civil EngineeringForeman Civil EngineeringSenior Construction Manager (m/f/d)

Key data

300 employees

Employees

1-2 years

Average project time

50 km

Average distance to construction projects in km

40 projects

Active Construction Projects

120,000,000 €

Annual construction volume in €

45 years

Employee Average Age

Building Construction, Engineering Structures

Project Types

Project Details

Project Start30th Sep 2023
Project End30th Sep 2027
Project Duration (Days)1461