

Pfaffendorf Rhine Bridge, Koblenz
Fritz Meyer GmbH Bauunternehmung (Meyer Bau)
Project Images
Project Description
Under our technical leadership, the new Rhine Bridge will be constructed between 2023 and 2027 in a transparent and airy design, following the guidelines of the UNESCO World Heritage and inspired by the railway bridge from 1864. The main construction lot includes 17 engineering structures as well as extensive road and canal construction measures on both sides of the Rhine.
About Fritz Meyer GmbH Bauunternehmung (Meyer Bau)
As a company with a long-standing tradition and over 75 years of success in the market, we have decades of experience in the construction industry, as well as in our daily interactions with people. Su...
Fritz Meyer GmbH Bauunternehmung (Meyer Bau) also employs
Key data
300 employees
Employees
1-2 years
Average project time
50 km
Average distance to construction projects in km
40 projects
Active Construction Projects
120,000,000 €
Annual construction volume in €
45 years
Employee Average Age
Building Construction, Engineering Structures
Project Types
Project Details
Location
Koblenz, Germany
Neustadt 17

_800x800.jpg%3Falt%3Dmedia%26token%3D45940228-e847-467c-867b-bf7b6a9575d9&w=3840&q=80)


