Cable Route Bacharach
KASSECKER
Project Images
Project Description
The Amprion GmbH carried out the construction of a new underground 110 kV cable route to connect the existing 110 kV facility Rheinböllen of Westnetz GmbH to the newly planned substation Bacharach. The total length of the cable routes, consisting of a total of 6 cable strands, is between approximately 997 m and approximately 1,090 m. In addition, the project served Amprion as a pilot project to investigate the limits of the so-called E-Power-Pipe method. For this purpose, support lengths of approximately 680 m are driven out of sheet pile pits in a closed construction method and the cable protection pipes are laid as individual strands using the E-Power-Pipe system from Herrenknecht.
About KASSECKER
KASSECKER stands for future-oriented competence in construction. With over 560 employees, we work on projects across regions in the business areas of high-rise and industrial construction, civil and p...
KASSECKER also employs
Key data
560 employees
Employees
65 projects
Active Construction Projects
113,000,000 €
Annual construction volume in €
39 years
Employee Average Age