Excavation work for the construction of a production hall with administrative building
Ernst Höbel GmbH
Project Images
Project Description
75,000 m³ of soil moved. The terrain is partially excavated, partially filled. Some of the material is stored temporarily so that it can be used to refill the basement after the construction is completed.