B33 Allensbach Konstanz District, Röhrenberg Tunnel

Eiffage Infra-Süd GmbH

Major Construction SiteCivil Engineering

Project Images

Project Description

The existing B 33 between Radolfzell and Konstanz is overloaded with traffic and will be expanded from two to four lanes. To relieve the population and protect them from noise, the road in the Allensbach area will be routed through a tunnel about 1,000 meters long, the Röhrenberg Tunnel.

The tunnel, designed as a two-cell reinforced concrete frame, along with an adjacent operations building, will be constructed using an open-cut method. Additional protection will be provided by structures and noise barriers up to 6 meters high.

Our construction activities will begin in mid-2024. The shell construction will be completed by mid-2028, allowing traffic to flow on the new roadway by the end of 2029. To ensure that existing traffic can continue without interruption during the construction period, work will be carried out parallel to the roadway.

The overall completion of the expansion and new construction of the B 33 is expected by 2034.

See original text

About Eiffage Infra-Süd GmbH

Learn more about the company behind the opportunity
Eiffage Infra-Süd GmbH
Eiffage Infra-Süd GmbH

Welcome to Eiffage Infra-Süd GmbH – your strong partner in the construction world! With our headquarters in the vibrant metropolitan region of Nuremberg and additional locations in Hersbruck, Pfaffenh...

See original text

Eiffage Infra-Süd GmbH also employs

Site Manager (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionProject Manager (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionConstruction Worker (m/f/d) for Civil Engineering, Road Construction, and Rail/Gleistrack ConstructionStructural Worker (m/f/d) Civil Engineering / Building MaintenanceSpecialized Worker (m/f/d) for Civil and Road ConstructionSpecialized Worker (m/f/d) Rail and Track ConstructionSpecialized Worker (m/f/d) Civil EngineeringCrane Operator (m/f/d)Show all

Key data

400 employees

Employees

2-3 years

Average project time

42 years

Employee Average Age

Civil Engineering, Engineering Structures

Project Types

Project Details