Nuremberg Harbor, Temporary Bridges
Eiffage Infra-Süd GmbH
Project Images
Project Description
The installation and insertion of the temporary bridges over the Main-Danube Canal has begun. The temporary bridges are part of the overall reconstruction of the port bridges in Nuremberg. After the successful bridge displacement by our consortium partner SEH Engineering GmbH, the SS80 bridge is now being lifted as a temporary bridge between axes 20 and 30. To move these forces, a 750-ton crane and a 1,200-ton crane are being used, which is considered the largest crane in Europe.