Eiffage Infra-Süd GmbH

Nuremberg Harbor, Temporary Bridges

Eiffage Infra-Süd GmbH

Major Construction Site

Project Images

Project Description

The installation and insertion of the temporary bridges over the Main-Danube Canal has begun. The temporary bridges are part of the overall reconstruction of the port bridges in Nuremberg. After the successful bridge displacement by our consortium partner SEH Engineering GmbH, the SS80 bridge is now being lifted as a temporary bridge between axes 20 and 30. To move these forces, a 750-ton crane and a 1,200-ton crane are being used, which is considered the largest crane in Europe.

See original text

About Eiffage Infra-Süd GmbH

Learn more about the company behind the opportunity
Eiffage Infra-Süd GmbH
Eiffage Infra-Süd GmbH

Welcome to Eiffage Infra-Süd GmbH – your strong partner in the construction world! With our headquarters in the vibrant metropolitan region of Nuremberg and additional locations in Hersbruck, Pfaffenh...

See original text

Eiffage Infra-Süd GmbH also employs

Site Manager (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionProject Manager (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionConstruction Worker (m/f/d) for Civil Engineering, Road Construction, and Rail/Gleistrack ConstructionStructural Worker (m/f/d) Civil Engineering / Building MaintenanceSpecialized Worker (m/f/d) for Civil and Road ConstructionSpecialized Worker (m/f/d) Rail and Track ConstructionSpecialized Worker (m/f/d) Civil EngineeringCrane Operator (m/f/d)Show all

Key data

400 employees

Employees

2-3 years

Average project time

42 years

Employee Average Age

Civil Engineering, Engineering Structures

Project Types

Project Details