The construction project 5-2 in Michelau is a particularly challenging bridge project. The curved layout and inclined cross-section of the structure present several challenges. With a three-span continuous beam totaling 156 meters in length, especially during the intermediate construction phases on scaffolding and between construction stages, demanding conditions have been created that are crucial for the development of the structure.

A standout challenge is the construction of the superstructure at an elevated position of about 1 meter, which is necessary due to the overpass of a railway line that remains operational during the construction. After the hollow box is prestressed and all temporary scaffolding and formwork are removed, the 156-meter-long superstructure is lowered into its final position using a hydraulically coupled lowering system in a process known as "stacking down."

See original text

About Eiffage Infra-Süd GmbH

Learn more about the company behind the opportunity
Eiffage Infra-Süd GmbH
Eiffage Infra-Süd GmbH

Welcome to Eiffage Infra-Süd GmbH – your strong partner in the construction world! With our headquarters in the vibrant metropolitan region of Nuremberg and additional locations in Hersbruck, Pfaffenh...

See original text

Eiffage Infra-Süd GmbH also employs

Site Manager (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionProject Manager (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionConstruction Worker (m/f/d) for Civil Engineering, Road Construction, and Rail/Gleistrack ConstructionStructural Worker (m/f/d) Civil Engineering / Building MaintenanceSpecialized Worker (m/f/d) for Civil and Road ConstructionSpecialized Worker (m/f/d) Rail and Track ConstructionSpecialized Worker (m/f/d) Civil EngineeringCrane Operator (m/f/d)Show all

Key data

400 employees

Employees

2-3 years

Average project time

42 years

Employee Average Age

Civil Engineering, Engineering Structures

Project Types

Project Details