Eiffage Infra-Süd GmbH

B173 Lichtenfels BW 8-1 and BW 7-1

Eiffage Infra-Süd GmbH

Bridge ConstructionRoadworks

Project Images

Project Description

Construction of the overpass structure 8-1 over the future two-lane B173

Construction of BW 7-1 for the underpass of a future flood channel

Road construction for the relocation of the B173 over a length of 1,022 m

See original text

About Eiffage Infra-Süd GmbH

Learn more about the company behind the opportunity
Eiffage Infra-Süd GmbH
Eiffage Infra-Süd GmbH

Welcome to Eiffage Infra-Süd GmbH – your strong partner in the construction world! With our headquarters in the vibrant metropolitan region of Nuremberg and additional locations in Hersbruck, Pfaffenh...

See original text

Eiffage Infra-Süd GmbH also employs

Site Manager (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionProject Manager (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Structural Engineering / Railway and Track ConstructionForeman (m/f/d) Civil and Road Construction / Engineering Construction / Railway and Track ConstructionConstruction Worker (m/f/d) for Civil Engineering, Road Construction, and Rail/Gleistrack ConstructionStructural Worker (m/f/d) Civil Engineering / Building MaintenanceSpecialized Worker (m/f/d) for Civil and Road ConstructionSpecialized Worker (m/f/d) Rail and Track ConstructionSpecialized Worker (m/f/d) Civil EngineeringCrane Operator (m/f/d)Show all

Key data

400 employees

Employees

2-3 years

Average project time

42 years

Employee Average Age

Civil Engineering, Engineering Structures

Project Types

Project Details