

Talbrücke Krondorf
Eiffage Infra-Süd GmbH
Project Images
Project Description
New construction of the over 50-year-old Krondorf viaduct near Velburg on the A3 Nuremberg / Regensburg due to its poor condition and the increasing traffic volume and the required load reserves. Renovation is not possible due to existing damage patterns and load capacity deficits. The existing bridge will be demolished in two construction phases and rebuilt using the incremental launching method. The new beam bridge will be designed as a continuous girder over nine spans, with support spans ranging from 30 to 60 meters. The structure has an impressive length of 475 meters and spans the valley at a height of approximately 40 meters.
About Eiffage Infra-Süd GmbH
Welcome to Eiffage Infra-Süd GmbH – your strong partner in the construction world! With our headquarters in the vibrant metropolitan region of Nuremberg and additional locations in Hersbruck, Pfaffenh...
Eiffage Infra-Süd GmbH also employs
Key data
400 employees
Employees
2-3 years
Average project time
42 years
Employee Average Age
Civil Engineering, Engineering Structures
Project Types



