Butzbach GmbH Industrietore

22 SPACELITE Lift Gates for the Traunreut City Depot

Butzbach GmbH Industrietore

AssemblyCommercial ConstructionsMajor Construction SiteElectrical EngineeringFacade Construction

Project Images

Project Description

Uniform Appearance of Gates and Facades

With the construction of the new municipal building yard in Traunreut, the various departments and equipment that were spread across multiple locations could be consolidated in one place. This resulted in 6 individual buildings with a covered area of 7,200 m²: administrative building, storage and factory halls, warehouses, vehicle workshops, and a heated vehicle hall.

Butzbach supplied a total of 22 SPACELITE lifting gates in the fiberglass color Brilliant for this new construction, with the corresponding gate numbers laminated into them. A large part of the remaining facade area was designed with the fiberglass facade system VARIOPLANplus with integrated doors. The use of fiberglass for both the gates and the facade gave the entire new building a uniform and distinctive look. A similar combination was implemented a few years ago in the new construction of the Traunreut municipal utilities and impressed to such an extent that this solution was also desired for the building yard.

See original text

About Butzbach GmbH Industrietore

Learn more about the company behind the opportunity
Butzbach GmbH Industrietore
Butzbach GmbH Industrietore

BUTZBACH was founded in 1953 and is now run as a German family business in its second generation. With over 280 employees, we are the specialists for hangar and industrial doors made in Germany.

From...

See original text

Butzbach GmbH Industrietore also employs

Installer (m/f/d) for large and hangar doorsInstaller (m/f/d) for industrial and high-speed doorsLead Installer (m/f/d) / Senior Installer (m/f/d) for Large and Hangar Door InstallationsField Service Technician (m/f/d)Maintenance Technician (m/f/d) for Gate Systems

Key data

280 employees

Employees

40 years

Employee Average Age

38,000,000 €

Annual construction volume in €

1-7 days

Average project time

25 projects

Active Construction Projects

Building Construction, Metal Construction

Project Types

Project Details

Location

Traunreut, Germany