Brauckmann & Damm GmbH

District heating tunnel under the Elbe

Brauckmann & Damm GmbH

Infrastructure & Earthworks

Project Images

Project Description

Brauckmann & Damm is currently doing the earthworks for the new district heating tunnel under the Elbe! We're digging the start and end shafts for the tunnel boring machine, which will be up to 38 meters deep.

This project is a crucial step in transforming district heating production in Hamburg. The central power plants north of the Elbe are being shut down and replaced by a modern, efficient, and decentralized heating network. The climate-neutral heat will come from various sources like a waste-to-energy plant, a wastewater heat pump, and other energy-intensive industries south of the Elbe.

To reach consumers north of the Elbe, the new tunnel will be drilled about two kilometers west of the Elbe Tunnel on the A7, from Köhlfleethafen near Finkenwerder to Elbchaussee.

We're proud to be part of this forward-thinking project and to contribute to Hamburg's sustainable energy supply!

For more exciting info about the project, check out: https://www.youtube.com/watch?v=h6Ad_OIgZqc&t=55s

See original text

About Brauckmann & Damm GmbH

Learn more about the company behind the opportunity
Brauckmann & Damm GmbH
Brauckmann & Damm GmbH

Brauckmann & Damm GmbH – Your New Employer in the Heart of Hamburg

NO Assembly *

Hello future colleagues (m/f/d)!

We are Brauckmann & Damm GmbH, a modern construction company based in the beautiful...

See original text

Brauckmann & Damm GmbH also employs

Site Manager (m/f/d) in Earthworks and Civil EngineeringForeman/Site Manager (m/f/d) in Earthworks and Civil EngineeringConstruction Equipment Operator (m/f/d) in Earthworks and Civil EngineeringRoad Construction Specialist (m/f/d)Skilled Worker (m/f/d) in Earthworks and Civil EngineeringSurveying Technician (m/f/d) in Earthworks and Civil EngineeringConstruction Worker (m/f/d) in Earthworks and Civil EngineeringTechnical Draftsman (m/f/d)/ Accountant (m/f/d)/ Accountant (m/f/d) in Earthworks and Civil EngineeringAssistant to the Management, Head of Finance and Accounting

Key data

2-3 years

Average project time

41 employees

Employees

45 years

Employee Average Age

50 km

Average distance to construction projects in km

20 projects

Active Construction Projects

Civil Engineering

Project Types

Project Details

Location

Hamburg, Germany

Tankweg