Project Description

Brauckmann & Damm got the job for the earthworks to build the new district heating tunnel. This includes digging the start and end shafts for the tunnel boring machine. The shafts are up to 38 meters deep. The district heating generation in Hamburg is set to change fundamentally in the coming years. Central power plants north of the Elbe will be shut down and replaced by an efficient and decentralized heating network. Climate-neutral waste heat will come from various sources, including a waste-to-energy plant, a sewage treatment plant's heat pump, and other energy-intensive industries south of the Elbe. The heat will be collected in a storage loop and brought to the required temperature level. To reach consumers north of the Elbe, a new Elbe crossing is needed. This will be drilled about two kilometers west of the Elbe Tunnel on the A7 motorway from Köhlfleethafen near Finkenwerder towards the northern Elbchaussee. (https://implenia.com/de-de/medien/artikel/implenia-baut-fernwaermetunnel-unter-der-elbe-hindurch/)

Client: Wärme Hamburg GmbH Contractor: Implenia Construction GmbH, Division Civil Engineering – Tunnelling Germany

Image source: https://implenia.com/fileadmin/_processed_/1/5/ csm_FWS_Startschacht_Grafik_JPG_300dpi_5b92f567c2.jpg

See original text

About Brauckmann & Damm GmbH

Learn more about the company behind the opportunity
Brauckmann & Damm GmbH
Brauckmann & Damm GmbH

Brauckmann & Damm GmbH – Your New Employer in the Heart of Hamburg

NO Assembly *

Hello future colleagues (m/f/d)!

We are Brauckmann & Damm GmbH, a modern construction company based in the beautiful...

See original text

Brauckmann & Damm GmbH also employs

Site Manager (m/f/d) in Earthworks and Civil EngineeringForeman/Site Manager (m/f/d) in Earthworks and Civil EngineeringConstruction Equipment Operator (m/f/d) in Earthworks and Civil EngineeringRoad Construction Specialist (m/f/d)Skilled Worker (m/f/d) in Earthworks and Civil EngineeringSurveying Technician (m/f/d) in Earthworks and Civil EngineeringConstruction Worker (m/f/d) in Earthworks and Civil EngineeringTechnical Draftsman (m/f/d)/ Accountant (m/f/d)/ Accountant (m/f/d) in Earthworks and Civil EngineeringAssistant to the Management, Head of Finance and Accounting

Key data

2-3 years

Average project time

41 employees

Employees

45 years

Employee Average Age

50 km

Average distance to construction projects in km

20 projects

Active Construction Projects

Civil Engineering

Project Types

Project Details

Location

Hamburg, Germany

Tankweg