

Preparatory Earthworks for Kirchwerder District School
Brauckmann & Damm GmbH
Project Images
Project Description
Brauckmann & Damm has been awarded the contract for the preparatory earthworks to get the construction site ready for the new building at the Stadtteilschule Kirchwerder. This part of the project includes large-scale soil removal and placement, totaling about 32,500 cubic meters, as well as the creation of a retention basin including water management.
The Stadtteilschule is currently located at Kirchwerder Hausdeich but needs to be relocated to a new area between Kirchenheerweg and Marschbahndamm due to increased space requirements. The future school is designed to accommodate about 1,000 to 1,100 students (https://vum-magazin.de/2017/06/30/siegerentwurf-neubau-sts-kirchwerder/).
Client: Free and Hanseatic City of Hamburg - SBH / Schulbau Hamburg
Image source: https://i0.wp.com/vum-magazin.de/wp-content/uploads/2017/06/Visualisierung.jpg?resize=1280%2C640&ssl=1
About Brauckmann & Damm GmbH
Brauckmann & Damm GmbH – Your New Employer in the Heart of Hamburg
NO Assembly *
Hello future colleagues (m/f/d)!
We are Brauckmann & Damm GmbH, a modern construction company based in the beautiful...
Brauckmann & Damm GmbH also employs
Key data
2-3 years
Average project time
41 employees
Employees
45 years
Employee Average Age
50 km
Average distance to construction projects in km
20 projects
Active Construction Projects
Civil Engineering
Project Types
