

The Circle - Zurich Airport
BAUER Gruppe
Project Images
Project Description
Whoever is at Zurich Airport cannot miss the new commercial center "The Circle". Bauer was commissioned with the foundation and construction of an energy pile system for this prestigious project. A total of 1,150 piles with a diameter of up to 1.5 m were drilled to a depth of up to 55 m. Afterwards, over 1,000 of these piles were geothermally activated and now serve as a central component of the heating and cooling supply. The special thing is: with a total capacity of around 1.8 MW, the implemented energy pile system is unique throughout Europe.
About BAUER Gruppe
🤝 Our employees have made us what we are today with their performance and dedication: a globally active corporate group with around 11,000 employees in about 70 countries. 🚀 We are proud of this ded...
BAUER Gruppe also employs
Key data
11,912 employees
Employees
1,700,000,000 €
Annual construction volume in €
40 years
Employee Average Age
Civil Engineering, Building Construction, Engineering Structures
Project Types

