Project Description

Whoever is at Zurich Airport cannot miss the new commercial center "The Circle". Bauer was commissioned with the foundation and construction of an energy pile system for this prestigious project. A total of 1,150 piles with a diameter of up to 1.5 m were drilled to a depth of up to 55 m. Afterwards, over 1,000 of these piles were geothermally activated and now serve as a central component of the heating and cooling supply. The special thing is: with a total capacity of around 1.8 MW, the implemented energy pile system is unique throughout Europe.

See original text

About BAUER Gruppe

Learn more about the company behind the opportunity
BAUER Gruppe
BAUER Gruppe

🤝 Our employees have made us what we are today with their performance and dedication: a globally active corporate group with around 11,000 employees in about 70 countries. 🚀 We are proud of this ded...

See original text

BAUER Gruppe also employs

Foreman (m/f)Construction Site Manager for Remediation of Contaminated Sites (m/f)Construction Site Manager Geothermal EnergyConstruction Engineer Energy/Geothermal (m/f)Construction Assistant / Career Changer (m/f)Equipment operator (m/f)

Key data

11,912 employees

Employees

1,700,000,000 €

Annual construction volume in €

40 years

Employee Average Age

Civil Engineering, Building Construction, Engineering Structures

Project Types

Project Details